The Voznesenskyi Bridge, which stopped the advance of the Russian occupation forces in the Mykolaiv region in 2022, has been completely rebuilt.

This was announced by the RDS company, the contractor commissioned by the Mykolaiv Regional Infrastructure Reconstruction and Development Service to perform the construction works, the CFTS portal reports.

The bridge was recently reopened to traffic.

32667d8466432161ab946634a492536f

The bridge has a length of 100 meters. Its roadway is 9.5 meters wide, and its sidewalks and bicycle lanes have a combined width of 6 meters.

The reconstruction of the public highway of national importance H-24, connecting Blahovischenske and Mykolaiv (through the town of Voznesensk), on the section between km 141+743 and km 142+048, began in June last year.

8431cf8a06c7b130131493dad1b56df6